Project 1: Foundation Engineering

wall chipping (gypsum plaster) 840.00

wall blank base treatment 456.00

wall/ground cement mortar leveling 2120.00

demolition of brick wall (240 mm) 50.00

light brick wall (120 mm double-sided plastering) 1344.00

painting of openings, beam bottoms and other parts after wall removal 90.00

demolition of bay window 217.50

project 2: Waterway Circuit engineering

strong and weak current construction (lump sum price) 6800.00

waterway construction (lump sum price) 1550.00

strong Installation of weak current box 100.00

change downpipe 444.00

change downpipe 378.00

balcony water outlet 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 1900.00

latex paint 760.00

gypsum board flat ceiling 180.00

gypsum board linear light trough ceiling 2555.50

wooden curtain box (concealed) (Blockboard) 181.50

item 4: primary bedroom

emulsion paint base treatment (putty) 1140.00

emulsion paint 456.00

item 5: secondary bedroom

emulsion paint base treatment (putty) 950.00

emulsion paint 380.00

item 6: Kitchen

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1440.00

common specification of floor tiles (size 300 × 300) 403.00

kitchen waterproof treatment 360.00

kitchen and sanitary package pipes 162.50

doorway stone paving 25.00

kitchen floor cement mortar leveling 260.00

item 7: bathroom

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1020.00

common specification of floor tiles (size 300 × 300) 186.00

toilet backfilling and surface leveling 210.00

toilet waterproof treatment 810.00

kitchen and sanitary package pipes 325.00

doorway stone paving 65.00

toilet dry area wall tile paving 378.00

item 8: balcony

emulsion paint base course treatment (putty) 100.00

emulsion paint 40.00

floor tile general specification (200 × 200 < size ≤ 800 × 800) 300.00

common specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1620.00

balcony handrail base tiling 105.00

balcony waterproof treatment 270.00

water pipe 182.00

Item 9: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

Di Gu 300.00

item 10: other charges

third party supervision 1299.0 0

Star foreman service fee 3000.00

know the approximate price in advance, which is not only convenient for capital preparation, but also convenient for judging the rationality of its quotation when choosing a decoration company. However, the decoration price is affected by too many factors. You might as well ask the decoration company to measure rooms on site, and make a detailed quotation according to your requirements. You are comparing. At the right time, the Wuhan home decoration network decoration bidding platform can select 3 to 4 suitable decoration companies to measure rooms on site for free, and formulate decoration plans. You can compare them, and some decoration money reduction is waiting for you. See the activity page for details http://whjzw.net/zb/。